Example project · Metalworking, special-purpose machine from 2008
Migrating machine control from S7-300 to S7-1500
Program migration to TIA Portal, a new HMI panel, cleaned-up PROFINET communication and updated EPLAN schematics, commissioned over a single weekend.
This is an example of the scope I deliver, not a description of a specific client deployment. The figures show typical targets for such a project.
Starting point
The S7-300 controller is going out of support, the HMI panel has no spare parts left and the delivery schematics do not reflect many later modifications. The machine builder no longer exists. The machine has to be back in production on Monday.
Solution
Survey of the cabinet and signals, migration of the program to TIA Portal with a cleaned-up structure, a new panel with screens mirroring the familiar operation, communication moved from PROFIBUS to PROFINET and a complete set of EPLAN schematics matching the actual state.
Scope of work
- Survey of signals and components in the cabinet
- Migration of the Step 7 program to TIA Portal, block refactoring
- New HMI panel with operator screens and diagnostics
- Moving drive and I/O communication from PROFIBUS to PROFINET
- EPLAN schematics and I/O lists matching the modernised state
- CPU and panel replacement and commissioning during a planned stop
Other projects
Production tracking and OEE on an assembly line
An MES application collecting parts, downtime and scrap from six workstations, with an OEE report for every shift.
C# / .NET · WinForms · SQL Server · OPC UA
Integrating injection moulding machines with ERP
Automatic download of orders from the ERP to the machines and feedback of parts and material consumption, without paper or terminals.
C# / .NET · Windows Service · OPC UA · Euromap 63
Quality control station with full traceability
A workstation application that guides the operator through inspection, records measurement results and links them to the serial number and batch.